HDR to lead design of Port of Long Beach Pier B rail project
The City of Long Beach Board of Harbor Commissioners has approved the selection of HDR to lead the design of the $870 Pier B On-Dock Rail Support...
The City of Long Beach Board of Harbor Commissioners has approved the selection of HDR to lead the design of the $870 Pier B On-Dock Rail Support...