PLN signs Serv-covered loan for Tambak Lorok
PLN has signed a SERV-backed loan to finance the construction of the 780MW Tambak Lorok combined cycle power plant in Semarang, Indonesia. The 14.5-year (with a 2.5-year availability period and 12-year repayment period) $201.7 million SERV-backed facility was priced at 70bp over...